国产92成人精品视频免费,成全动漫在线观看剧情,狸猫换太子电视剧,四川少bbb搡bbb爽爽爽

Welcome to Changzhou painuo Electronic Co. ltd.!
contact
  • General manager: Mr.Wang
  • Phone: +86-13382882032
  • Tel: +86-519-83331905
  • Fax: +86-519-89185073
  • Web: m.qyjmsdc.com
  • E-mail: wkfpainuo@163.com
  • Add: No.15, Xinhu Road, Xueyan Town, Wujin District, Changzhou City
problem
Position:Home > problem >

Processing and solarPhotovoltaic solar energy laying cable p

(1) A metal cable pipe should not have perforations, cracks, severe corrosion significantly uneven and so on, the pipe wall should be smooth and without glitches. After the cable pipe bending should not have cracks or significantly dented phenomenon, the degree of bend pipe diameter of not more than 10%, the nozzle should be made of horn or polished.
(2) The cable tube diameter of not less than 1.5 times the cable diameter, bend radius should be consistent with the provisions of penetration of cable bend radius. Each cable should not be more than three pipe elbow. Not more than two right angles.
(3) Connecting cable pipe shall meet the following requirements:
a, metal pipes should adopt large short tube socket level, short tube weld ends sealed with a threaded connection time, the connection sealed.
b, metal pipe at the socket or plug, the insertion depth of not less than 1.1 to 1.8 times the diameter, the docking surfaces should be coated with glue cement seal. When using sockets, casing welding ends should be sealed in order to ensure a secure seal.
c, thin-walled steel welded connection is strictly prohibited.
(4) When the thin-walled steel pipe for the cable should be coated with anti-corrosion paint (inside concrete buried pipe may not be painted); When using galvanized pipes, galvanized layer is peeled position should also be coated with anti-corrosion paint.
(5) Lead to the cable pipe outlet location devices should be easy device connection and without prejudice to dismantling and access. Parallel cable laying pipe mouth should be arranged in neat rows.
(6) The protective tube for the grounding wire when use of the cable, the ground wire should be welded well, then the laying of cables. There are threaded pipe joints, should be soldered jumpers.
(7) Pipe into the box (box) To straight, in box (box) within the exposed length equal to or less than 5 mm, with locking nut of the tube, the tube is exposed thread locknut 2 to 4 buckles .

Preparation and installation of cable tray:
(1) Cable tray and accessories should be properly stored and custody, should not cause deformation and damage, and should be product certification.
(2) Cable trays should be installed firmly, smooth vertical and horizontal, the vertical deviation should not be greater than the length of 2/1000, the level of error should not be larger than the width of 2/1000.
(3) Cable bridge in the live production of non-standard parts and welding, must be painted anticorrosive primer, paint should be uniform and complete color consistency.
Prev:None     Next:None
综合爱爱网| 小太正裸体脱裤子无遮挡| 亚洲国产一区二区三区| 精品少妇爆乳无码AⅤ区| 日韩av毛片免费在线观看| 重口味电影| 少妇搡bbbb搡bbb搡澳门| 天堂网在线观看| 无码熟妇人妻Av影片在| 天天躁日日躁狠狠躁aa| 亚洲成色www成人网站妖精| 黄色片网站国产| 国产盗摄精品aⅴ一区二区| 日日摸夜夜摸狠狠摸婷婷| 亚洲av综合色区无码区| 好好热精品视频在线观看| 国产精品亚洲日韩第一页| 高清有码| 亚洲国产图片小说一区二区| 美女免费在线视频级91| 日韩精品一二三区在线播放| 亚洲av香蕉色一区二区| 握住校花两团雪乳高h| free性满足hd| 啊啊啊在线免费视频网站| 女高潮淫荡视频在线播放| 桃色av一区二区三区在线| 我把护士日出水了视频90分钟| 97超级碰国产一区二区| 久久精品国产亚洲av忘忧| 大地中文在线观看免费高清| 青青操精品视频在线视频| 暗呦交小u女国产精品视频| 在线精品视频一区二区三区| 国产精品久久久无码ay| 她扒下内裤让我爽了一夜a片| 久久久久久之久久久久久| 欧美一级成人一区二区三区| 久久婷婷色综合一区二区| 又黄又湿又免费的视频| 玉米地做爰视频全过程|